PM launches Kien Giang gas project

KIÊN GIANG (VNS) — Prime Minister Nguyễn Tấn Dũng launched the Block B-Ô Môn gas project by the Việt Nam National Oil and Gas Group (PetroVietnam) in the southern province of Kiên Giang yesterday.

The project hopes to collect 107 billion cubic metres of gas and 12.65 million barrels of condensate from offshore Block B.
Around 5.06 billion cubic metres of gas are expected to be brought ashore per year from 2020 to 2040 to fuel power plants in Kiên Giang and Ô Môn District of Cần Thơ City.
The development of Block B will cost US$6.8 billion within 20 years, covering one technology centre and 46 drilling platforms, one accommodation platform, one condensate tank, and approximately 750 drilling wells.

The Block B – Ô Môn gas pipeline worth US$1.2 billion is designed to have a capacity of 20.3 million cubic metres. It will transport gas from Block B to An Minh District in Kiên Giang province and supplement gas for the PM3 – Cà Mau pipeline.
The 431km pipeline is also expected to provide gas for a number of gas turbine power plants in the two Mekong Delta localities.

The projects will be put into operation in the second quarter of 2020.
Prime Minister Dũng hailed PetroVietnam’s endeavours and asked it to ensure project safety, quality, efficiency and progress. — VNS

读完这篇文章,无论您在规划招聘还是职业发展,HeadHunt Vietnam 都可以为您提供支持。

  • 搜索在招职位

    按地点、行业、职能与职级筛选。职位可能由 ESS 服务负责,或通过职位发布服务上线。

    职位搜索
  • 暂时没有匹配岗位?

    欢迎先提交简历进入人才库。出现匹配职位后,招聘顾问会第一时间与您联系。

    提交简历
  • 用专业咨询加速你的职业进阶

    加入人才库,获得招聘顾问对简历与面试的反馈,并选择适合下一步发展的咨询方案。

    职业咨询